Glossary

Terms, acronyms, and internal jargon that took you a minute to figure out the first time you heard them. Grouped by category below; alphabetical within each group where it makes sense.

Abbreviations

TermMeaning
ACAlternating Current
aFRRAutomatic Frequency Restoration Reserve
CAPEXCapital Expenditure
CMCapacity Market
CODCommercial Operation Date
EOLEnd Of Life
FCRFrequency Containment Reserve (Primary Reserve)
GWGigawatt
IRRInternal Rate of Return
kWKilowatt
MWMegawatt
MWhMegawatt-hour
NPVNet Present Value
OPEXOperating Expenditure
PVPresent Value
RESRenewable Energy System
TWhTerawatt-hour
…/kW gridPer kW of grid export capacity
…/kW RESPer kW of RES asset peak export capacity
…/kW storagePer kW of battery export capacity (measured at the inverter AC output)

Definitions

TermMeaning
Cycle targetTarget number of cycles that the storage system performs in a day on average, evaluated on a yearly basis.
Round-trip efficiencyEfficiency of the storage system from inverter AC input to inverter AC output.
AvailabilityPercentage of time during which your storage project can operate at rated conditions, unaffected by outage.
Storage degradationAurora models the impact of degradation on the storage asset's energy capacity (MWh) due to cycling.
DurationPeriod for which your storage project could discharge at its rated AC capacity.
End of life valueRemaining value of storage asset that can be recovered after the end of the asset's lifecycle.
Discount rateRate at which project's total cashflow is discounted to calculate its net present value.

Cost assumptions sheet

TermMeaning
Battery systemContainerised battery storage systems; main components include: cells, modules, and battery, thermal and energy management systems.
InverterCost of inverter used to switch from AC to DC during charging and DC to AC during discharge.
Balance of systemCost of system components excluding battery system and inverter; including control, monitoring and protection components, other electrical balance of system and structural elements of site.
DevelopmentCost of project development including: project origination and acquisition; connection and planning studies and applications; land acquisition and control and developer overhead and profit.
Grid connectionCost of establishing a grid connection to the distribution or transmission network.
EPC soft costsCosts of designing and constructing a storage system site, including specialised workforce, construction labour and overhead and profits for construction contractors.
Fixed O&MCost of operation and maintenance, includes costs such as scheduled maintenance, performance monitoring, warranty extension, and extended performance guarantees.
InsuranceCost of insurance, can include liability, environmental, property, and other insurances such as cyber security.
Business ratesCost of taxes paid on properties used for non-domestic purposes.
Trading & optimisation feesCharges for electricity trading as well as optimisation fees for use of software or external providers managing optimised battery use.
Grid chargesCost of network charges, can vary significantly depending on site and in case local upgrades to distribution grids are required. Typically paid either as annual capacity charge or per kWh exchanged with the grid.
Land leaseAgreement allowing use of land in exchange for rent.
OtherCovers cost such as auxiliary load, admin, communication and other small costs.

Note: More details can be found in the report.

Degraded/undegraded batteries sheet

TermMeaning
Repower countThe repowering phase the asset is in. Repower Count will start at 0 and equal 1 after the 1st repowering.
Achieved daily cyclesAverage number of charge-discharge cycles achieved per day, where each cycle represents a full charge and discharge of the asset (though not necessarily consecutive), calculated based on the asset's current capacity.
Percentage of initial duration remainingPercentage of initial storage duration remaining at the end of the time period due to degradation.
Total storage charge/discharge volumeVolume of energy charged to the storage asset from the grid / discharged from the grid, measured at the grid connection. Represents contractual value, therefore when relevant churn actions are included in this fact.
'Market_name' discharge/charge cashflowRevenue obtained and costs incurred by the storage system through the export / import of power in 'Market_name'.
Total energy trading cashflowTotal revenues obtained by exporting power minus the cost for importing power in energy trading markets.
Total capacity-based ancillary services cashflowTotal cashflow for storage asset from payments for both availability and utilisation (if remunerated) across all ancillary service markets.
Capacity Market cashflowRevenue obtained in Capacity Market auctions.
Storage-from-RES / RES-to-storage cashflowCost attributed to the battery asset for charging energy from the RES asset. This cashflow financially accounts for the opportunity cost for the battery asset of not charging from the grid but instead receiving it from the RES asset. Storage-from-RES cashflow = − RES-to-storage cashflow
(RES output)Indicates that an output is measured at the RES DC output for a solar asset and the RES AC output for a wind asset, rather than at the grid connection point.
RES-to-grid volumeVolume of energy discharged to the grid from the RES.
RES clipping lossesVolume of clipped RES generation measured at the RES output. Clipping occurs when the RES inverter and/or grid export capacity is lower than the RES peak capacity and therefore some proportion of energy produced is not exported to grid or storage.
RES grid curtailment volumeVolume of RES generation lost due to grid curtailment. Grid curtailment occurs when the asset's generation is not exported due to restrictions imposed by the TSO.
RES economic curtailment volumeVolume of RES generation curtailed economically when RES exporting to grid would lead to negative revenue.
RES available volumeRES available generation volume measured at the RES DC output for a solar asset and the RES AC output for a wind asset. When the solar DC peak capacity is oversized relative to the solar inverter capacity, this fact represents the virtual/theoretical generation which would happen if the solar was not clipped by the inverter.
Total project cashflowTotal gross margin for the entire site, including adjustment cashflows for storage asset inability to meet planned commitments and RES contribution for co-located sites if applicable.
Storage energy retention after degradationFraction of initial storage energy capacity volume remaining at the end of the time period due to degradation. It determines when repowering is triggered. This is not affected by efficiency degradation, see "Storage duration remaining after degradation" for the combination of both degradation types.
Storage duration remaining after degradationFraction of initial storage duration remaining at the end of the time period due to degradation. Storage duration at a fixed power level is affected by both energy capacity volume degradation, see "Storage energy retention after degradation", and DC-DC roundtrip efficiency degradation (if enabled). This fact captures the combined impact of these effects on usable storage duration.

Markets, tariffs and services

TermMeaning
Day-ahead marketWholesale market where commitments to generate or consume electricity are traded one day prior to delivery.
Intraday marketWholesale spot market where commitments to generate or consume electricity are traded up to few minutes before delivery, adjusting for real-time demand and supply.
aFRR marketAutomatic Frequency Restoration Reserve, secondary reserve market for several countries in Continental Europe. Includes a capacity-based and an energy-based components procured in separate tenders, response time is 5min.
mFRR marketManual Frequency Restoration Reserve, tertiary reserve market. Includes a capacity-based and an energy-based component procured in separate tenders, response time is 15min.
FCR marketFrequency Containment Reserve, primary reserve market for initial containment of frequency deviations, capacity-based, response time is 30sec.