Skip to main content

DC Colocated BESS (11A): Capacities and Databook Logic

1. What a DC colocated 11A project is​

The battery connects on the DC side of the PV plant, before the inverter. PV and battery share the same inverter and the same grid connection point. The battery charges exclusively from the PV. It never charges from the grid.

No Grid → BESS flow.

What this means in practice:

  • The battery fills only with PV energy. Its ability to cycle therefore depends on PV output: less sun means less energy to charge with, especially in winter.
  • PV and battery share the export limit. When the battery discharges, it "takes up" inverter and grid capacity that the PV would otherwise use.
  • The battery can capture energy that would otherwise be lost: clipping, when the PV produces more than the inverter can take, and curtailment.
  • Co-location brings CAPEX and OPEX savings (shared inverter, connection, infrastructure). The model calculates these separately, with assumptions specific to "Co-location with Solar DC 11A".

2. The key capacities​

CapacityWhat it isRole in the model
Grid connection capacityThe maximum the whole project (PV + battery together) can export to the grid.Normalisation basis for all results ("per MW grid").
Shared inverter capacityThe power of the inverter shared by PV and battery. Usually equal to the grid capacity. It is a limit of the site layout, not a battery size.Physical constraint in the simulation.
RES capacityThe power of the PV plant.Scales PV costs. It is also the battery's only charging source.
Storage installed capacityThe installed (nameplate) power of the battery, the one you buy.Battery costs: CAPEX, OPEX, repowering, end of life value.
Storage AC capacity (usable)The power the battery can actually deliver. Usually a percentage of the installed capacity. In Aurora it is storage_ac_rated_export_capacity.Revenues and volumes: dispatch runs on this.
DurationHow many hours the battery can discharge at usable power.Battery energy = usable capacity × duration.
Cycle targetTarget cycles per day, on an annual basis.Constraint in the simulation.

:::tip The rule You pay for the installed capacity and earn revenue from the usable capacity. The grid/inverter capacity belongs to the whole project and is not a battery size. :::


3. The basis of results: "per MW grid"​

All volumes and all monetary amounts in the databook, for both battery and PV, are expressed per unit of grid connection:

  • volumes in MWh/MW grid
  • revenues, costs, NPV in €/kW grid

Conversions for the battery:

Absolute volume (MWh) = Volume (MWh/MW grid) × Grid capacity
Volume per MW of battery = Absolute volume / Usable capacity
Theoretical maximum (MWh/year) = Usable capacity × Duration × Cycles/day × 365
Utilisation = Absolute volume / Theoretical maximum

Hypothetical example​

PV 200 MW, grid/inverter 200 MW, battery 110 MW installed and 100 MW usable, 4 hours, 1 cycle per day.

StepCalculationResult
Storage total discharge (from Revenues)–700 MWh/MW grid
Total discharge700 × 200140,000 MWh
Theoretical maximum100 × 4 × 1 × 365146,000 MWh
Utilisation140,000 / 146,000≈ 96%, reasonable

What pulls utilisation below 100%:

  • Battery availability and degradation.
  • Specifically in 11A: days with low PV output, when the battery cannot fill up completely because it cannot charge from the grid.

:::warning The DC colocated trap The shared inverter capacity is usually equal to the grid capacity (200 MW here). If this value is passed in as "Storage AC capacity", the battery appears to be 200 MW. You then expect 292,000 MWh, see 140,000, and wrongly conclude that it does half a cycle per day.

The correct source for the battery's power is always storage_ac_rated_export_capacity, never shared_inverter_export_capacity_mw. :::


4. Energy flows in Revenues​

Battery​

LineMeaning
Day-Ahead / Intraday / mFRR / aFRR discharge volumeDischarge per market.
Day-Ahead / Intraday / mFRR / aFRR charge volumeCharging from the grid per market. In 11A it must be 0.
Storage total discharge volumeTotal discharge.
Storage total charge-from-grid volumeTotal charging from the grid. In 11A it must be 0.
Storage charge-from-RES volumeCharging from the PV, measured at the battery terminals. Shown as negative (input to the battery). In 11A it is the only charging source.

PV​

LineMeaning
RES available volumeAll available PV output.
RES-to-grid volumeWhat goes directly to the grid.
RES-to-storage volumeWhat goes from the PV to the battery. The same amount as the battery's charge-from-RES, with a positive sign.
RES clipping lossesEnergy lost because the PV exceeds the inverter limit.
RES curtailment volumeEnergy that is curtailed.

Balance check:

RES available ≈ RES-to-grid + RES-to-storage + clipping + curtailment

5. How the model works: revenues and costs​

5.1 Battery revenues​

  • They come ready-made from the Aurora simulation in €/kW grid and are based on the usable capacity.
  • Energy-based: Day-Ahead, Intraday, mFRR and aFRR energy (discharge only, since there is no charging from the grid).
  • Capacity-based (ancillary services): mFRR, aFRR and FCR capacity.
  • The "Storage AC capacity" line is informational: it does not enter the monetary amounts and is used only to count the operating years.

5.2 Internal PV → battery transfer​

Since the battery charges only from the PV, the battery's "charging cost" is the value of the PV energy it absorbs. The model values it with a transfer price:

  • Storage-from-RES cashflow: negative for the battery, which "buys" energy from the PV.
  • RES-to-storage cashflow: positive for the PV, which "sells" energy to the battery.

The two amounts are equal and opposite and cancel out at project level. They exist only to show how much value each part creates on its own. They do not affect the result in the Project total cashflow.

5.3 Battery costs​

Cost assumptions are in €/kW of storage, i.e. per kW of installed battery. Conversion to €/kW grid:

Cost (€/kW grid) = Cost (€/kW storage) × Installed capacity / Grid capacity

This is how CAPEX (including repowering), OPEX and end of life value are calculated. CAPEX is paid one year before the battery enters the market.

Hypothetical example: 700 €/kW storage × 110 / 200 = 385 €/kW grid.

5.4 PV costs​

Same logic: €/kW of RES asset × RES capacity / Grid capacity.

5.5 Co-location savings​

  • CAPEX savings ("Co-location with Solar DC 11A"): given directly in €/kW grid and reduce the total project cost.
  • OPEX savings: calculated as a percentage of OPEX.

5.6 Why it all ties together​

All amounts are on the same basis (€/kW grid), so NPV, IRR and payback are consistent:

  • battery revenues correspond to the usable capacity,
  • battery costs correspond to the installed capacity,
  • PV costs correspond to the RES capacity,
  • and everything is divided by the grid capacity.

6. Naming​

LabelMeaning
Storage installed capacityBattery nameplate power. User input in Inputs, used for costs.
Storage AC capacity (Revenues)Usable battery power from Aurora. Used for revenues and volumes.
RES capacityPV power from the Aurora data.
Grid export capacityConnection capacity. The denominator of all results.
storage_ac_rated_export_capacity (meta_data)The correct source for the battery's power.
shared_inverter_export_capacity_mw (meta_data)Shared inverter limit. Not a battery size.
site_configuration = dc_colocated_batteryIndicates that the scenario is DC colocated.
storage_import_from_grid = 0The battery does not charge from the grid. In 11A it must always be 0.

7. Checklist for every new 11A databook​

  1. Fill in Storage installed capacity in Inputs. If left empty, the model falls back to the usable capacity and costs are underestimated by the installed/usable difference.
  2. Check that the scenario is set up correctly as 11A in meta_data: site_configuration = dc_colocated_battery and storage_import_from_grid = 0.
  3. Check that all charging from the grid is 0 in Revenues: every "charge volume" per market and the "total charge-from-grid volume". If not, the scenario is not 11A.
  4. Check that "Storage AC capacity" in Revenues shows the usable battery capacity, not the inverter/grid capacity. If it equals the grid capacity, something is wrong.
  5. Do not rename the "Storage AC capacity" label. Model formulas look it up by name.
  6. Sanity check the volumes with the formulas in section 3. Expect utilisation of roughly 90–100%. Slightly lower can be justified by days with low PV output.
  7. PV balance check with the formula in section 4.
  8. Check that charge-from-RES and RES-to-storage are equal and opposite, and likewise for the corresponding cashflows.
  9. Check that the capacities in Inputs (RES, grid) match those Aurora used.

For the physical layout of the DC-coupled site in Chronos (DC-DC converter, shared inverter, switch), see Chronos BESS Configurations.